Hotpoint HDI90X Manuel d'utilisateur Page 6

  • Télécharger
  • Ajouter à mon manuel
  • Imprimer
  • Page
    / 16
  • Table des matières
  • MARQUE LIVRES
  • Noté. / 5. Basé sur avis des utilisateurs
Vue de la page 5
6GB
INSTALLATION
Drilling the Ceiling/shelf and fixing the frame
DRILLING THE CEILING / SUPPORT SHELF
Use a plumb line to mark the centre of the hob on the ceiling/support shelf.
Place the drilling template 21 provided on the ceiling/support shelf, making sure that the template
is in the correct position by lining up the axes of the template with those of the hob.
Mark the centres of the holes in the template.
Drill the holes at the points marked:
For concrete ceilings, drill for plugs appropriate to the screw size.
For hollow brick ceilings with wall thickness of 20mm: drill ø 10mm.
For wooden beam ceilings, drill according to the wood screws to be used.
For wooden shelf, drill ø 7mm.
For the power supply cable feed, drill ø 10mm.
For the air outlet (Ducted version), drill according to the diameter of the external air exhaust
duct connection.
Vue de la page 5
1 2 3 4 5 6 7 8 9 10 11 ... 15 16

Commentaires sur ces manuels

Pas de commentaire